BOP Preventers + BJ 350 ton Spider Elevator + Casing busing + CASING ELEVATOR + CHOKE VALVE + CROSS OVER + ELECTRIC MOTOR + Elevators + Rotary Table + High pressure BOP test pump + Cementing Unit + Master Bushing + Generator + Mud Pump + Kelly Bushing + MANUAL TONG + STABILIZERS + Cementing Equipment + VARCO KELLY SPINNER + Casing + Separator + MI Swaco + Tanks + Drilling Bits

Cameron 18-3/4” 10K PIPE RAMS

1. Cameron 18-34” 10K PIPE RAMS type U.jpg

Cameron 18-3/4” 10K PIPE RAMS type U Quantity 10 Set certified

Kelly drive bushing

DSC00911.JPG

Kelly drive bushing Varco HDP W/ 4 ½ & 3 ½.

Martin Decker 15K BOP Test Pump

Martin Decker Hydraulic BOP Test Pump.JPG

Martin Decker 15000 psi BOP Test Pump complete with chart recorder complete with hose and gauge.

Deadline Anchor

1. Dead Line Anchor.jpg

Deadline Anchor for 3000 hp Drawwork

Varco 350 Spider slip insert

IMG_0749.JPG

Varco 350 Spider slip insert 6 set

Master Bushing

2. Master Bushing.JPG

Varco Master Bushing 37 1/2".

National Swivel P500

39.JPG

National Swivel P-500 ton complety Refurbish Certified

Drawwork

2.JPG

National Drawwork 1320 UE Drum Grooved for 1 3/8" wire line Sand reel complete w/ 12000 ft of 9/16"

HT 400 Cementing Pumping Unit

Halliburton HT400 pic

HT 400 Cementing Pumping Unit driven with 2 detroit deisel engine complete with control panel and jet automatic mixer with density control and with 2 centrifugal pump.
1. Hydraulic System with Detroit Deisel Engine
2. Cement Silo Tank

24 1/2 Inch BJ spider elevator 500 ton

20141223_150623.jpg

USED BJ 24 1/2in 500 ton Spider elevator air operated Qty 2 ea
Used BJ 20” Slips Qty 1 ea

© 2009 MBG, All rights reserved.

Powered By: SharpVision